HotLine: 400-784-6318 0755-8321 2500

250-ton voltage transformer Vietnam heavy lift ship case

 

POL: Shanghai

 

POD: Ho Chi Minh, Vietnam

 

Commodity: 1 transformer of 250 tons per piece

 

Shipping method: heavy lift ship

 

Shipping time: September 2013

1.jpg

 

2.jpg

310X174.jpg

Transformer MAFI Solution

 

POL: Xinsha, Mayong, Dongguan

 

POD: Port Klang, Malaysia

 

Commodity: A set of dry-type transformers

(the maximum weight of a single piece are 65 tons)

 

Shipping method: MAFI

 

Shipping time: October 2013

1.jpg

  

2.jpg3.jpg

 

Durban project 40FR case

 

POL: Shekou

 

POD: Durban, South Africa

 

Commodity: 1 Transformer of 33.8 MT

 

Shipping method: shipped in 1*40FR

 

Shipping time: February 2014

1.jpg

 

2.jpg3.jpg

Wind power equipment bulk ship case

 

POL: Shanghai

 

POD: Karachi

 

Commodity: wind power equipment (The longest one 22 M)

 

Shipping method: Breakbulk

 

Shipping time: March 2015

1.jpg 

2.jpg3.jpg
4.jpg5.jpg6.jpg

 

Steam Surbine exported to Karachi

 

POL: Shanghai

 

POD: Karachi

 

Commodity: Steam Turbine (Maximum Weight 44 tons per piece)

 

Shipping method: Breakbulk

 

Shipping time: August 2012

汽轮机出口卡拉奇散杂船案列 (1).jpg

  

汽轮机出口卡拉奇散杂船案列 (2).jpg

汽轮机出口卡拉奇散杂船案列 (3).jpg

 

Hydroelectric Equipment

 

POL: Shekou

 

POD: Singapore

 

Commodity: Hydroelectric Power Generation Equipment

 

Shipping method: 1*40FR

 

Shipping time: April 2013

水轮发电设备40FR装箱案列 (1).jpg

 

 

水轮发电设备40FR装箱案列 (2).jpg水轮发电设备40FR装箱案列 (3).jpg
CntrHits:-
Keywords:Heavy lifting,MAFI,BBK(CNTR),Port Service